Pakistan programs / USAID Energy Policy Project (EPP)
Key awd:391-TO-12-00002
28 facts shown; 1 unconfirmed link; 1 support mechanism (not programs) 1 data error; 284 documents cite this program.
The one-paragraph answer: years, implementer, funder and purpose, each from document metadata.
Description: not available yet. When it is, it appears here with its source (IATI, a DEC document abstract, a cited summary, or one generated from the documents), never without one.
Operated in: Pakistan.
Districts, regions and facilities the program's own documents name, with what the document says it did there. Source: sentences in the program's documents
not in the map yet: no district, region or facility is named for this program yet; only Malawi and Guatemala have place data so far
No district, region or facility is named in this program's documents yet. Place dots exist for Malawi and Guatemala only so far. Towns and natural features are not drawn.
Countries where this program operated, set by the countries its documents name most often. Countries only tagged on documents are listed apart. Source: document tags, scope rule
Operated in Pakistan, 2009 to 2016 284 sources
Scope: country: Pakistan. The award code belongs to this country's mission. High confidence.
How sure we are: 0.9.
When the program ran, from its start year to the latest document year. A hatched bar means the start is our estimate. Source: award and document years
Axis: award years, end from years in documents. The start year comes from award fiscal year; the end is the latest document year, so the program may have run longer.
Who started the program, and which administration it began under. Timing only; it does not say who started it. Source: initiative records, start year
Programs that came before or after this one. A stated link names a document; a likely link is read from the text. Source: succession links
IMPLEMENTATION STATUS LEAP has successfully built upon EPP to achieve its two-fold goal – (1) to increase access to affordable and reliable energy supplies in order to foster economic, political and social development in Liberia; and (2) to support transparent policy reform processes and energy sector regulatory regimes.
Organizations that ran this program, from award records and document authors. Prime and sub roles are not split yet. Source: award and document records
Named as an institutional author on documents; whether prime, sub or consortium member is not recorded. Basis: read from a record field
| Name | Role | Years | Basis | Evidence |
|---|---|---|---|---|
| Advanced Engineering Associates International (AEAI) | implementer | 2009 to 2016 | Stated in a document | 283 sources |
| GOPA-International Energy Consultants GmbH (Intec) | implementer | 2015 | Stated in a document |
Contracts and vehicles that served this program (evaluation, M&E, research). Never counted as programs. Source: document metadata
A support mechanism is never counted as a program.
Identifiers of the awards and the organizations that funded it. Amounts are under Money. Source: award records
Basis: read from a record field
| Name | Years | Basis | Evidence |
|---|---|---|---|
| EPP-I-03-00004 (idiq, FY2003) | 2009 to 2016 | Stated in a document | 285 sources |
| 391-TO-12-00002 (task order, FY2012) | 2009 to 2016 | Stated in a document | 283 sources |
Labels on the program's documents, not a description of what the program did. Source: DEC document tags
Sector profile (computed): Energy (power, fuels, renewables, efficiency) 61%; Good governance 8%; Housing, urban and municipal infrastructure 5%
DEC topic and subject tags. They describe the documents, not what the program was. Each tag opens its evidence in the drawer.
Programs worth reading next, by topic, implementer, country and years. Similar by facets (topic, implementer, country, years) and, when available, description. It says the programs look alike, not how they are related in time. Source: catalog facets
Looking for similar programs.
Studies that assessed this program, and the lessons taken from them. Source: linked evaluation documents
| Title | Year | Document | Why listed |
|---|---|---|---|
| EPP Environmental Audit Report, Environmental Compliance Monitoring of Gomal Zam Multipurpose Dam Project, Report 01 | 2012 | PA-00K-V1V | evaluation-stage document (eval other, weak classifier) |
| EPP Environmental Audit Report, Environmental Compliance Monitoring of Muzaffargarh Thermal Power Station Visit 1, April 2012 | 2012 | PA-00K-WFB | evaluation-stage document (eval other, weak classifier) |
| EPP Environmental Audit Report, Environmental Compliance Monitoring of Muzaffargarh Thermal Power Station Visit 2, October 2012 | 2012 | PA-00K-WFC | evaluation-stage document (eval other, weak classifier) |
Not recorded yet: money rows. A missing record is not a finding. USAspending records start in FY2007; earlier obligations are missing, not zero.
Every document that cites this program, grouped by a stage label from a weak classifier. Source: document library
| (AEAI) | implementer | 2015 | Stated in a document | 1 source |
| Name | Years | Basis | Evidence |
|---|---|---|---|
| data error: fact without evidence Power distribution program (PDP) | |||
None recorded for this program. A counterpart appears only when a document names the government body and its role.
| 2015 |
| Stated in a document |
| 1 source |
| 391-C-15-00004 (contract, FY2015) | 2015 | Stated in a document | 1 source |
Basis: read from a record field
| Name | Years | Basis | Evidence |
|---|---|---|---|
| USAID. Mission to Pakistan | 2009 to 2016 | Stated in a document | 282 sources |
| USAID. Bur. for Economic Growth, Education and Environment | 2015 | Stated in a document | 1 source |
| 08588 - USAID. Mission to Pakistan | 2014 | Stated in a document | 1 source |
| AID-EPP-I-00-03-00004, AID-391-TO-12-00002 | 2014 | Stated in a document | 1 source |
| Name | Years | Basis | Evidence |
|---|---|---|---|
| Pakistan | 2015 | Stated in a document read from a record field | 4 sources |
| 2013 |
| PA-00K-WFD |
| evaluation-stage document (eval other, weak classifier) |
| EPP Environmental Audit Report, Environmental Compliance Monitoring of Muzaffargarh Thermal Power Station Visit 4, April 2013 | 2013 | PA-00K-WFF | evaluation-stage document (eval other, weak classifier) |
| EPP Environmental Audit Report, Environmental Compliance Monitoring of Muzaffargarh Thermal Power Station Visit 5, October 2013 | 2013 | PA-00K-WFG | evaluation-stage document (eval other, weak classifier) |
| EPP Post-Training Evaluation, Best Practices in Hydro Operations and Maintenance (O&M) November 10-21, 2014 | 2014 | PA-00K-WSF | linked as an evaluation of this program |
| EPP Post-Training Evaluation, Best Practices in Hydro Operations and Maintenance (O&M) October 20-31, 2014 | 2014 | PA-00K-WSG | linked as an evaluation of this program |
| EPP Post-Training Evaluation, Best Practices in Thermal Operations and Maintenance (O&M) June 9-20, 2014 | 2014 | PA-00K-WSR | linked as an evaluation of this program |
| EPP Post-Training Evaluation, Best Practices in Thermal Operations and Maintenance (O&M) March 31 - April 11, 2014 | 2014 | PA-00K-WSK | linked as an evaluation of this program |
| EPP Feedback Evaluation Report of Training on Power Sector Integrated Model (PowerSIM) Ministry of Water and Power (December 2-6, 2013) | 2014 | PA-00K-X18 | linked as an evaluation of this program |
| EPP Feedback Evaluation Report of Training on Power Sector Integrated Model (PowerSIM) June 21, 2014 | 2014 | PA-00K-X17 | linked as an evaluation of this program |
| EPP Post-Training Evaluation, Best Practices in Thermal Operations and Maintenance (O&M) May 19-30, 2014 | 2014 | PA-00K-WSN | linked as an evaluation of this program |
| EPP Post-Training Evaluation Best Practices in Grid Operations for NTDC Participant Training Program (October 20 – 31, 2014) | 2014 | PA-00K-SGG | linked as an evaluation of this program |
| EPP Feedback Evaluation Report on Storage Area Network Training CPPA, Lahore (September 15-19, 2014) | 2014 | PA-00K-X19 | linked as an evaluation of this program |
| EPP Post-Training Evaluation, Best Practices in Hydro Operations and Maintenance (O&M) December 8-19, 2014 | 2014 | PA-00K-WSH | linked as an evaluation of this program |
| Energy policy program's end-of-project performance evaluation | 2015 | PA-00K-WMM | evaluation-stage document (eval final, weak classifier) |
| EPP Feedback Evaluation Report of Training on Power Sector Integrated Model (PowerSIM) (December 2013 – October 2015) | 2015 | PA-00K-V8G | evaluation-stage document (eval other, weak classifier) |
| EPP Technical Audit Report Bahawalpur 220kV Grid Station January 2015 | 2015 | PA-00K-X2B | evaluation-stage document (eval other, weak classifier) |
| EPP Technical Audit Report Domail Bannu 220kV Grid Station January 2015 | 2015 | PA-00K-X2D | evaluation-stage document (eval other, weak classifier) |
| EPP Technical Audit Report Bund Road 220kV Grid Station January 2015 | 2015 | PA-00K-X2F | evaluation-stage document (eval other, weak classifier) |
| EPP Technical Audit Report Burhan 220kV Grid Station January 2015 | 2015 | PA-00K-X2G | evaluation-stage document (eval other, weak classifier) |
| EPP Technical Audit Report Dadu 500kV Grid Station January 2015 | 2015 | PA-00K-X2H | evaluation-stage document (eval other, weak classifier) |
| EPP Technical Audit Report Daharki 220kV Grid Station January 2015 | 2015 | PA-00K-X2J | evaluation-stage document (eval other, weak classifier) |
| EPP Technical Audit Report Daud Khel 220kV Grid Station January 2015 | 2015 | PA-00K-X2K | evaluation-stage document (eval other, weak classifier) |
| EPP Technical Audit Report Gakhar 220kV Grid Station January 2015 | 2015 | PA-00K-X2M | evaluation-stage document (eval other, weak classifier) |
| EPP Technical Audit Report Gatti 500kV Grid Station January 2015 | 2015 | PA-00K-X2N | evaluation-stage document (eval other, weak classifier) |
| EPP Technical Audit Report Guddu 500kV Grid Station January 2015 | 2015 | PA-00K-X2P | evaluation-stage document (eval other, weak classifier) |
| EPP Technical Audit Report Hala Road 220kV Grid Station January 2015 | 2015 | PA-00K-X2Q | evaluation-stage document (eval other, weak classifier) |
| EPP Technical Audit Report ISPR (Sangjani) 220kV Grid Station January 2015 | 2015 | PA-00K-X2R | evaluation-stage document (eval other, weak classifier) |
| EPP Technical Audit Report Jamshoro 500kV Grid Station January 2015 | 2015 | PA-00K-X2S | evaluation-stage document (eval other, weak classifier) |
| EPP Technical Audit Report Jaranwala 220kV Grid Station January 2015 | 2015 | PA-00K-X2T | evaluation-stage document (eval other, weak classifier) |
| EPP Technical Audit Report Kala Shah Kaku 220kV Grid Station January 2015 | 2015 | PA-00K-X2V | evaluation-stage document (eval other, weak classifier) |
| EPP Technical Audit Report Ludewala 220kV Grid Station January 2015 | 2015 | PA-00K-X2W | evaluation-stage document (eval other, weak classifier) |
| EPP Technical Audit Report Mardan 220kV Grid Station January 2015 | 2015 | PA-00K-X2X | evaluation-stage document (eval other, weak classifier) |
| EPP Technical Audit Report Multan 500kV Grid Station January 2015 | 2015 | PA-00K-X2Z | evaluation-stage document (eval other, weak classifier) |
| EPP Technical Audit Report Muzaffargarh 220kV Grid Station January 2015 | 2015 | PA-00K-X31 | evaluation-stage document (eval other, weak classifier) |
| EPP Technical Audit Report Muzaffargarh 500kV Grid Station January 2015 | 2015 | PA-00K-X32 | evaluation-stage document (eval other, weak classifier) |
| EPP Technical Audit Report New Kot Lakhpat 220kV Grid Station January 2015 | 2015 | PA-00K-X33 | evaluation-stage document (eval other, weak classifier) |
| EPP Technical Audit Report Nishatabad 220kV Grid Station January 2015 | 2015 | PA-00K-X34 | evaluation-stage document (eval other, weak classifier) |
| EPP Technical Audit Report NKI 500kV Grid Station January 2015 | 2015 | PA-00K-X35 | evaluation-stage document (eval other, weak classifier) |
| EPP Technical Audit Report Nokhar 500kV Grid Station January 2015 | 2015 | PA-00K-X36 | evaluation-stage document (eval other, weak classifier) |
| EPP Technical Audit Report Ravi Road 220kV Grid Station January 2015 | 2015 | PA-00K-X37 | evaluation-stage document (eval other, weak classifier) |
| EPP Technical Audit Report Rawat 500kV Grid Station January 2015 | 2015 | PA-00K-X38 | evaluation-stage document (eval other, weak classifier) |
| EPP Technical Audit Report Rohri 220kV Grid Station January 2015 | 2015 | PA-00K-X39 | evaluation-stage document (eval other, weak classifier) |
| EPP Technical Audit Report Sahowala (Sialkot) 220kV Grid Station January 2015 | 2015 | PA-00K-X3C | evaluation-stage document (eval other, weak classifier) |
| EPP Technical Audit Report Summandry Road 220kV Grid Station January 2015 | 2015 | PA-00K-X3D | evaluation-stage document (eval other, weak classifier) |
| EPP Technical Audit Report Sarfaraznagar 220kV Grid Station January 2015 | 2015 | PA-00K-X3F | evaluation-stage document (eval other, weak classifier) |
| EPP Technical Audit Report Shahi Bagh 220kV Grid Station January 2015 | 2015 | PA-00K-X3G | evaluation-stage document (eval other, weak classifier) |
| EPP Technical Audit Report Sheikh Muhammadi 500kV Grid Station January 2015 | 2015 | PA-00K-X3H | evaluation-stage document (eval other, weak classifier) |
| EPP Technical Audit Report Sheikhupura 500kV Grid Station January 2015 | 2015 | PA-00K-X3J | evaluation-stage document (eval other, weak classifier) |
| EPP Technical Audit Report Shikarpur 220kV Grid Station January 2015 | 2015 | PA-00K-X3M | evaluation-stage document (eval other, weak classifier) |
| EPP Technical Audit Report TM Khan Road Hyderabad 220kV Grid Station January 2015 | 2015 | PA-00K-X3N | evaluation-stage document (eval other, weak classifier) |
| EPP Technical Audit Report University Islamabad 220kV Grid Station January 2015 | 2015 | PA-00K-X3P | evaluation-stage document (eval other, weak classifier) |
| EPP Technical Audit Report Vehari 220kV Grid Station January 2015 | 2015 | PA-00K-X3Q | evaluation-stage document (eval other, weak classifier) |
| EPP Technical Audit Report WAPDA Town 220kV Grid Station January 2015 | 2015 | PA-00K-X3R | evaluation-stage document (eval other, weak classifier) |