In upgrading water control and delivery systems, the Egypt Water Use and Management Project chose to replace the below grade earth structure of a private irrigation canal (mesqa) serving 24 ha's with a raised design built of concrete… DEC abstract (PN-AAM-710)
Review evidence: check the facts on this page before you cite them.Review evidence
0 of 22 checked, 0 flagged
Keys: j and k move, c checks, f flags, Esc leaves review. Marks are saved in this browser only.
No quote: this fact comes from a metadata field, shown as stored.
No quote: this fact comes from a metadata field, shown as stored.
No quote: this fact comes from a metadata field, shown as stored.
No quote: this fact comes from a metadata field, shown as stored.
No quote: this fact comes from a metadata field, shown as stored.
No quote: this fact comes from a metadata field, shown as stored.
No quote: this fact comes from a metadata field, shown as stored.